SAJ B1 Solar Lithium Battery 5.1kHw
How to install B1 Battery
SAJ Hybrid Inverter - 3.6kW / 5kW / 6kW
How to install H1 hybrid solar inverter
How to power on H1 Hybrid Inverter & B1 Battery
H1 initial setup of country code, date and time
How to change the grid compliance
How to change & make the battery setting via H1
H1 & B1 basic configuration
SAJ AC Retrofit Storage System
SAJ AS1 AC retrofit storage system
Installation of AS1 & B1
SAJ Product Set-up
Creating a plant and customer account
Pairing inverter with your router
SAJ Product Installer Guide
SAJ FAQ's
(i) From your mobile device log into the eSolar O&M App using the same username and password that you use for logging into the eSolar portal account.
(ii) Select the icon at the bottom right-hand side of your screen which will show a menu of options where you need to select “Remote Configuration”.
(iii) From this screen select either Bluetooth or WiFi for how you wish to connect to the inverter for configuration. When using Bluetooth remember to enable Bluetooth on your phone.
(iv) Initial Settings – Set time and grid code
(v) Battery - Set Battery to SAJ-CAN (when using SAJ battery)
(vi) Measuring Device – Select the appropriate configuration. Eg. For H1 set to single phase DDSU666 (100A CT based) meter, and ensure the address is set to 1.
It would also be useful if you had an RJ45 crimping tool in case you need to make off any comms cables.
(i) Use the eSolar O&M App to check that you have selected the correct battery.
(ii) For SAJ batteries, check that the last battery connected to the inverter has the COM3 RJ45 termination resistor in place.
(iii) Check the communication cable from the H1 comes from the CAN port and connects into COM2 of the first battery.
(iv) Check the DIP switch settings of the battery are set correctly. Eg. Battery 1 has all switches set to OFF (0000), battery 2 has DIP switches set (0001), battery 3 has DIP switches set (0010).
(v) If you need to change any of the DIP switches: adjust the DIP switch settings, then switch the battery OFF and then ON again to apply the new settings to the battery. Then turn the H1 off and on again.
(i) Check the CT is correctly placed in the system and is the correct way around. It should be located on the main incomer and the arrow on it should face towards the loads of the building not towards the grid. If the incomer goes into a Henley block, ensure the CT is on the incomer side of the Henley block otherwise readings will be wrong.
(ii) Ensure the CT leads are connected to the meter correctly, White to pin 5, and Blue to pin 6.
(iii) Ensure the ethernet cable between the inverter and the meter is connected from the inverter RS485 port to the meter:
- RS485A[inverter pin7 to meter pin 24]
RS485B[inverter pin8 to meter pin 25]
Help Centre
SAJ B1 Solar Lithium Battery 5.1kHw
How to install B1 Battery
SAJ Hybrid Inverter - 3.6kW / 5kW / 6kW
How to install H1 hybrid solar inverter
How to power on H1 Hybrid Inverter & B1 Battery
H1 initial setup of country code, date and time
How to change the grid compliance
How to change & make the battery setting via H1
H1 & B1 basic configuration
SAJ AC Retrofit Storage System
SAJ AS1 AC retrofit storage system
Installation of AS1 & B1
SAJ Product Set-up
Creating a plant and customer account
Pairing inverter with your router
SAJ Product Installer Guide
SAJ FAQ's
(i) From your mobile device log into the eSolar O&M App using the same username and password that you use for logging into the eSolar portal account.
(ii) Select the icon at the bottom right-hand side of your screen which will show a menu of options where you need to select “Remote Configuration”.
(iii) From this screen select either Bluetooth or WiFi for how you wish to connect to the inverter for configuration. When using Bluetooth remember to enable Bluetooth on your phone.
(iv) Initial Settings – Set time and grid code
(v) Battery - Set Battery to SAJ-CAN (when using SAJ battery)
(vi) Measuring Device – Select the appropriate configuration. Eg. For H1 set to single phase DDSU666 (100A CT based) meter, and ensure the address is set to 1.
It would also be useful if you had an RJ45 crimping tool in case you need to make off any comms cables.
(i) Use the eSolar O&M App to check that you have selected the correct battery.
(ii) For SAJ batteries, check that the last battery connected to the inverter has the COM3 RJ45 termination resistor in place.
(iii) Check the communication cable from the H1 comes from the CAN port and connects into COM2 of the first battery.
(iv) Check the DIP switch settings of the battery are set correctly. Eg. Battery 1 has all switches set to OFF (0000), battery 2 has DIP switches set (0001), battery 3 has DIP switches set (0010).
(v) If you need to change any of the DIP switches: adjust the DIP switch settings, then switch the battery OFF and then ON again to apply the new settings to the battery. Then turn the H1 off and on again.
(i) Check the CT is correctly placed in the system and is the correct way around. It should be located on the main incomer and the arrow on it should face towards the loads of the building not towards the grid. If the incomer goes into a Henley block, ensure the CT is on the incomer side of the Henley block otherwise readings will be wrong.
(ii) Ensure the CT leads are connected to the meter correctly, White to pin 5, and Blue to pin 6.
(iii) Ensure the ethernet cable between the inverter and the meter is connected from the inverter RS485 port to the meter:
- RS485A[inverter pin7 to meter pin 24]
RS485B[inverter pin8 to meter pin 25]