Solen Energy 0151 448 9662  |  Mon-Thurs 8am-5pm, Fri 8am-4pm
Call Us (Monday - Thursday 8am - 5pm, Friday 8am - 4pm): 0151 448 9662

Sunsynk 5.32kWh IP65 W5.3 Battery (Including Cable Sets)

Item Code: SUN-BATT-5.32-W
Brand:

Sunsynk


Quantity
( 27 available )
Share

Sunsynk remains a leader in the field of renewable energy solutions, offering industry-leading solar inverters and battery storage systems tailored for modern energy needs. Known for their advanced hybrid technology and intelligent energy management, Sunsynk products are trusted in both residential and commercial sectors for delivering reliable, sustainable, and efficient power solutions.

 SUN-BATT-5.32-W – Sunsynk 5.32kWh IP65 W5.3 Battery (Including Cable Sets)

The Sunsynk SUN-BATT-5.32-W is a high-performance 5.32kWh lithium iron phosphate (LiFePO₄) battery engineered for efficient solar energy storage. Whether for residential or commercial use, this battery provides dependable backup power and seamless integration with Sunsynk inverters and energy management systems. With 80% depth of discharge and a scalable design, it delivers both flexibility and reliability.

Key Features:

  • 5.32kWh Storage Capacity: Offers robust energy backup and load-shifting for daily use or emergencies.
  • Expandable Design: Scalable up to 16 units per inverter, delivering up to 85.12kWh of total storage.
  • High Usable Capacity: 80% depth of discharge maximises usable energy and system efficiency.
  • Grid Independence: Supports continuous power supply during outages or peak demand periods.
  • Durable Construction: IP65-rated for resistance to dust, moisture, and outdoor elements.
  • Built-In Safety: Includes a 125A MCB isolator and internal fire suppression for added peace of mind.
  • Compact & Lightweight: Easy to install and manage in tight or varied spaces.

Product Specifications:

  • Model: SUN-BATT-5.32-W
  • Storage Capacity: 5.32kWh
  • Depth of Discharge: 80%
  • Weight: 45kg
  • Dimensions: 450 x 150 x 533 mm
  • IP Rating: IP65
  • Scalability: Up to 16 units per inverter


  • Sunsynk Battery 5.32kW User Manual / File size: 1.81 MB
  • Sunsynk Battery W5.3 Datasheet / File size: 0.61 MB
Brand Sunsynk
Type Batteries
Power rating 4.0kW-5.8kW

Disclaimer: We have taken measures to ensure that all information, including this product page and all the downloadable publications are correct. Nevertheless, Solen Energy UK Limited accept no liability for errors or information that is incorrect or considered misleading. Suggestions for or descriptions of the end use or application of products or working methods are for information purposes only and Solen Energy UK Limited and its subsidiaries accept no liability for them.