Solen Energy 0151 448 9662  |  Mon-Thurs 8am-5pm, Fri 8am-4pm
Call Us (Monday - Thursday 8am - 5pm, Friday 8am - 4pm): 0151 448 9662

SolarEdge S1000 Optimiser -1000W 18 A, 125 VDC LONG LEAD 1GMXMBT

Item Code: S1000-1GMXMBT
Brand:

SolarEdge


Quantity
( 614 available )
Share

SolarEdge Technologies continues to redefine smart energy with state-of-the-art inverter systems and power optimizers that enhance solar power performance. Focused on increasing energy output while minimizing operational costs, SolarEdge solutions support the shift to cleaner, more efficient energy use for both residential and commercial sectors. With innovations in monitoring, optimization, and safety, SolarEdge empowers users to maximise solar returns with confidence.

S1000-1GMXMBT – SolarEdge S1000 Power Optimiser (1000W, 18A, 125VDC, Long Lead)

The S1000-1GMXMBT is SolarEdge’s most advanced module-level power optimiser, engineered for high-output solar installations. Designed to connect two photovoltaic (PV) panels of up to 500W each, it significantly reduces hardware requirements while delivering up to 99.5% efficiency through superior MPPT (Maximum Power Point Tracking) performance. Its long-lead configuration adds flexibility for streamlined installation and superior cable management in large-scale deployments.

Key Features:

  • Ultra-High Efficiency: Achieves 99.5% energy conversion through precise, module-level MPPT, maximising energy yield.
  • Dual Module Capability: Connects two high-power PV modules per optimiser, reducing part count and installation time.
  • Bifacial & High-Wattage Module Ready: Compatible with modern high-output and bifacial PV technologies.
  • Sense Connect Technology: Continuously monitors connector temperatures to detect overheating or poor connections before faults occur.
  • SafeDC™ Protection: Automatically drops high-voltage DC to safe levels during system shutdowns, enhancing installer and firefighter safety.
  • Optimised Layout: Supports higher string currents and features long lead lengths for simplified wiring in complex array configurations.

Product Specifications:

  • Model: S1000-1GMXMBT
  • Rated Output: 1000W (based on module configuration)
  • Warranty: 25 Years
  • SolarEdge EMC Certificate of Compliance / File size: 0.4 MB
  • SolarEdge Installer Starter Guide / File size: 2.15 MB
  • SolarEdge Limited Product Warranty / File size: 0.19 MB
  • SolarEdge Optimiser Intercompatibility Note / File size: 0.23 MB
  • SolarEdge S1000 Datasheet / File size: 0.83 MB
  • SolarEdge S-Series Commercial Brochure / File size: 2.1 MB
  • SolarEdge Commercial Catalogue / File size: 9.82 MB

Disclaimer: We have taken measures to ensure that all information, including this product page and all the downloadable publications are correct. Nevertheless, Solen Energy UK Limited accept no liability for errors or information that is incorrect or considered misleading. Suggestions for or descriptions of the end use or application of products or working methods are for information purposes only and Solen Energy UK Limited and its subsidiaries accept no liability for them.