Solen Energy 0151 448 9662  |  Mon-Thurs 8am-5pm, Fri 8am-4pm
Call Us (Monday - Thursday 8am - 5pm, Friday 8am - 4pm): 0151 448 9662

SolarEdge S1200 - Optimiser - 2s. LONG LEAD

Item Code: S1200-1GMYMBV
Brand:

SolarEdge


Quantity
( 1629 available )
Share

SolarEdge Technologies continues to lead the charge in smart energy with advanced solutions that optimise solar performance, reduce costs, and accelerate the adoption of clean energy. By integrating intelligent inverters, power optimisers, and comprehensive monitoring systems, SolarEdge empowers users to achieve maximum efficiency and energy independence across residential and commercial applications.

S1200-1GMYMBV- SolarEdge S1200 - Optimiser - 2s. Output cable 5.4m, input 1.6m LONG LEAD

The SolarEdge S1200-1GMYMBV Optimiser is a powerful, dual-module solution built for commercial solar energy systems. With support for two high-output photovoltaic panels the S1200 enables flexible system layouts and reduces the number of optimisers required, streamlining installations and minimising component costs.

Designed for maximum reliability and safety, the S1200 includes module-level voltage shutdown and real-time monitoring features. It automatically detects irregularities in PV connector behaviour, preventing potential faults before they impact system performance. This optimiser also supports bifacial panels and complex roof geometries, making it an ideal choice for high-performance, scalable solar arrays.

Key Features: 

  • Dual-Module Support: Optimises two PV modules per unit for more efficient system design
  • Shading Resilience: Maintains strong output even in partially shaded conditions
  • Sense Connect Technology: Monitors connector temperatures to pre-empt arc faults
  • Module-Level Shutdown: Enhances safety for installers, emergency services, and system maintenance
  • Fast, Easy Installation: Single-bolt mounting and simplified cable management
  • Real-Time Fault Detection: Alerts abnormal PV connector behaviour to ensure reliability
  • Bifacial Compatibility: Works with advanced PV technologies and maximises available roof space
  • Exceptional Efficiency: Delivers up to 99.5% energy conversion for peak system performance

Product Specifications: 

  • Model: S1200-1GMYMBV
  • Rated Output Power: 1200W (based on module configuration)
  • Warranty: 25 Years
  • SolarEdge Installer Starter Guide / File size: 2.15 MB
  • SolarEdge Limited Product Warranty / File size: 0.19 MB
  • SolarEdge S1200 Datasheet / File size: 0.3 MB
  • SolarEdge Optimiser Intercompatibility Note / File size: 0.23 MB
  • SolarEdge S Series Commercial Brochure / File size: 2.1 MB
  • SolarEdge EMC Certificate of Compliance / File size: 0.4 MB
  • SolarEdge Commercial Catalogue / File size: 9.82 MB
Brand Solar Edge
Type Optimisers

Disclaimer: We have taken measures to ensure that all information, including this product page and all the downloadable publications are correct. Nevertheless, Solen Energy UK Limited accept no liability for errors or information that is incorrect or considered misleading. Suggestions for or descriptions of the end use or application of products or working methods are for information purposes only and Solen Energy UK Limited and its subsidiaries accept no liability for them.