Solen Energy 0151 448 9662  |  Mon-Thurs 8am-5pm, Fri 8am-4pm
Call Us (Monday - Thursday 8am - 5pm, Friday 8am - 4pm): 0151 448 9662

Sunsynk 5.32kWh Sunsynk Battery IP65 with long lead

Item Code: SUN-BATT-5.32-IP65

Quantity
( 0 available )
Share

Sunsynk remains at the forefront of solar energy technology, delivering dependable storage solutions that integrate seamlessly with advanced solar and inverter systems. Designed for efficiency, safety, and scalability, Sunsynk batteries provide the reliability needed to maximise solar power usage and minimise grid reliance for residential and commercial setups.

SUN-BATT-5.32-IP65 – 5.32kWh Lithium Iron Phosphate Battery with Long Lead (IP65 Rated)

The SUN-BATT-5.32-IP65 is a durable and high-performing 5.32kWh lithium iron phosphate (LiFePO₄) battery engineered for optimal energy storage. Encased in an IP65-rated enclosure, it offers exceptional protection against dust, water, and weather, making it ideal for both indoor and outdoor installations.

Equipped with an intelligent Battery Management System (BMS), this unit safeguards against overcharging, deep discharging, and thermal risks while balancing cells for peak efficiency. Its long lead cable ensures flexibility during setup, especially in complex installations, and the modular design allows users to expand capacity easily by stacking additional units. Designed for longevity, this battery delivers over 6,000 cycles and supports high-speed charging and discharging, making it an excellent choice for scalable energy systems.

Key Features:

  • 5.32kWh Capacity: Delivers substantial storage for home and small business energy systems.

  • LiFePO₄ Chemistry: Provides high thermal stability, safety, and an extended cycle life.

  • IP65 Weatherproof Enclosure: Offers robust protection in challenging indoor and outdoor environments.

  • Advanced BMS: Monitors charge/discharge cycles and ensures cell balance for extended battery life.

  • Installation Flexibility: Long lead cable simplifies setup in tight or unconventional spaces.

  • Modular Scalability: Easily stack and connect multiple units to meet growing energy needs.

  • Fast Charge/Discharge Compatibility: Integrates smoothly with a range of inverter systems.

  • Extended Lifespan: Rated for over 6,000 cycles with built-in protections for overheating, short-circuiting, and overloading.

  • Sunsynk 5.32kWh IP65 Datasheet / File size: 0.24 MB
  • Sunsynk 5.32kWh IP65 User Manual / File size: 3.35 MB

Disclaimer: We have taken measures to ensure that all information, including this product page and all the downloadable publications are correct. Nevertheless, Solen Energy UK Limited accept no liability for errors or information that is incorrect or considered misleading. Suggestions for or descriptions of the end use or application of products or working methods are for information purposes only and Solen Energy UK Limited and its subsidiaries accept no liability for them.